$325.00
PJM clearing price per MW-day of unforced capacity, delivery year 2028/2029 — the FERC-approved cap, hit for a third consecutive auction
$118,625
ACCB™ — annualized cost per MW of PJM capacity for 2028/2029, up 11.2-fold from 2024/2025 — Axis metric
3.87×
Ratio between the most and least expensive U.S. capacity market for delivery year 2026/2027, on a normalized annual basis — Axis calculation
6,831 MW
Shortfall of PJM procured capacity against the one-in-ten-year reliability requirement, a second consecutive miss
$46.81
Load-weighted wholesale energy price per MWh at U.S. benchmark hubs, summer 2026 — down 5% year on year
Axis Annualized Capacity Cost Benchmark (ACCB™) — baseline reading, delivery year 2026/2027
$89,067
Spread per MW-year
PJM RTO — $329.17/MW-day
$120,147
MISO LRZ 1–7 — $126.19 annualized
$46,059
MISO LRZ 9 — $123.12 annualized
$44,939
MISO LRZ 8 and 10 — $116.06 annualized
$42,362
ISO New England — $2.590/kW-month
$31,080
ERCOT — no capacity market
Excluded
Formula: ACCB™ = clearing price ($/MW-day) × 365.
Where a market publishes dollars per kilowatt-month: ACCB = price × 12 × 1,000.
Where a market publishes seasonal prices: the operator's own published annualized price is used, never a seasonal price multiplied by 365.
PJM 329.17 × 365 = $120,147. MISO 126.19 × 365 = $46,059. ISO-NE 2.590 × 12 × 1,000 = $31,080. Spread = 120,147 − 31,080 = $89,067 per MW-year.
Reproducibility. PJM separately publishes its price collar in annual terms — $120,147 per MW-year for 2026/2027 and $121,705 for 2027/2028. ACCB reproduces both to the dollar from the daily prices, so the conversion is the operator's own arithmetic rather than a modelling choice.
Scope. ERCOT is excluded because it runs no forward capacity market and recovers fixed costs through energy scarcity pricing. NYISO is excluded because it clears capacity through monthly and seasonal auctions rather than one forward delivery-year price. Both are published as blanks in the dataset rather than filled with a number that would mean something different from the ones beside it.
Collar suppression 2028/29
$83,848
Per MW-year held back by the price cap. PJM's uncapped simulation clears at $554.72/MW-day against the actual $325.00 — 70.7% higher, up from 18.0% two auctions earlier.
New generation cleared
524.7 MW
New build and uprates clearing the 2028/2029 auction, out of a 138,318 MW market and down from 774.3 MW the prior cycle. Three capped auctions have not produced a supply wave.
Large-load requirement
+1,374.5 MW
Increase in PJM's forecast load feeding the reliability requirement, which PJM attributes largely to additional large loads. The requirement rose from 152,400 to 156,013 MW UCAP.
Reserve margin gap
14.4% vs 20.0%
RPM reserve margin procured against the installed reserve margin needed for a one-day-in-ten-years standard — 5.6 points short, the second consecutive auction more than a point below.
PJM Base Residual Auction clearing price and annualized capacity cost, delivery years 2018/2019 to 2028/2029
Clearing prices and cleared UCAP: PJM Interconnection, 2028/2029 Base Residual Auction Report, Table 2, July 14 2026. ACCB™ line: Axis Intelligence Research, clearing price × 365.
ACCB™ by market and delivery year, US$ per MW-year
Inputs: PJM 2028/2029 BRA Report; MISO 2026 Planning Resource Auction results; ISO New England Forward Capacity Auction results. ACCB™: Axis Intelligence Research.
PJM capped clearing price against the operator's uncapped simulation, US$ per MW-day
PJM Interconnection, 2028/2029 Base Residual Auction Report, Appendix Table 2, July 14 2026. PJM notes the simulation used offers as actually submitted.
Wholesale energy price change by region, summer 2026 against summer 2025
Federal Energy Regulatory Commission, 2026 Summer Energy Market and Electric Reliability Assessment, May 21 2026, citing EIA Short-Term Energy Outlook Table 7a.
Capacity adder in US$ per MWh at a 90% load factor, against the $46.81/MWh energy benchmark
Axis Intelligence Research, from ACCB™ inputs. The benchmark is a national summer load-weighted average, so the comparison indicates scale rather than an all-in delivered cost.
Net summer capacity additions and retirements by region, October 2025 to September 2026, GW
Federal Energy Regulatory Commission, 2026 Summer Assessment, Figures 15 and 16, from EIA Form 860M. Net change column: Axis Intelligence Research.
Summer 2026 U.S. electricity consumption by sector against the 2021–2025 average, TWh
Federal Energy Regulatory Commission, 2026 Summer Assessment, Figures 12 and 13, from EIA Form 912 and STEO Table 7a. Percentage gaps: Axis Intelligence Research.
PJM cleared capacity against the reliability requirement, delivery years 2025/2026 to 2028/2029, MW UCAP
PJM Interconnection, 2028/2029 Base Residual Auction Report, July 14 2026. The 2027/2028 and 2028/2029 auctions are the first in PJM history in which the entire RTO fell short.
PJM Base Residual Auction series, 2018/2019 to 2028/2029
PJM Interconnection, 2028/2029 Base Residual Auction Report, Tables 1 and 2 and Appendix Table 2, July 14 2026. ACCB™ column and the percentage gaps in the final column: Axis Intelligence Research. In the 2028/2029 uncapped simulation the ComEd Locational Deliverability Area clears separately at $776.69/MW-day.